The Space Infra Solutions
Guruseva Mandal Auditorium
710-seat auditorium with multi-hall campus — 1.5 year turnkey delivery.
- Client
- Guruseva Mandal
- Location
- Parner
Overview
Main auditorium with single-layer acoustic treatment and vermiculite acoustic paint. Ceiling in compressed rockwool tiles; project included construction, interior design, acoustic treatment, and audio system over 1.5 years.
Delivered as part of a multi-hall campus, the auditorium balances speech clarity for lectures and sufficient musical warmth for cultural performances. Coordinated civil, interior, and AV scopes under a single turnkey program.
Scope & deliverables
- Construction and interior coordination
- Acoustic treatment and ceiling systems
- Pro audio integration
- Campus-wide AV planning and handover


